Master Planning

Kalamata | 2023 | Ongoing

Kalamata Old Port

A working port that stopped working. The plan keeps the two grain silos, removes the 1970s customs shed, and returns the quay edge to the town by taking out the road that had been laid along it.

Area
18.4 ha
Phases
Four, to 2034
Quay restored
1 240 m
New build
11% of site
Kalamata Old Port

Patras | 2020 | Study

Patras Riverfront Study

A study, not a masterplan: we were asked what the river could carry, and the answer was less building than the brief assumed. Published in full, including the parts that argued against the commission.

Length
3.1 km
Crossings
Seven, five kept
Flood return
1 in 100 years
Trees added
640
Patras Riverfront Study