Process

Six phases. Most projects run 18 to 32 months from first conversation to completion. We do not prepare renderings; we work in section drawings, axonometrics, and physical models.

01

Conversation

A 60-minute meeting with Alkmini and Ektoras. We come prepared with the cardinal-axis diagram for your site and a list of questions. If the answers are wrong for us, we say so here rather than later.

No fee
02

Brief & feasibility

A one-page brief and a feasibility report: zoning, structural envelope, daylight study. One page, because if the brief needs two the project is not understood yet.

4–8 weeks
03

Concept

Section drawings first. A chipboard model at 1:200 and the programme. No plans until the section works, and no renders at all.

6–10 weeks
04

Developed design

Plans, sections, elevations, a balsa model at 1:50, and the materials palette as physical samples rather than a board.

12–18 weeks
05

Permitting & tender

Permit drawings, tender pack, contractor selection. We recommend three contractors and tell you which one we would use.

8–14 weeks
06

Construction

Site visits at minimum every fortnight by Alkmini or Ektoras — never by someone who was not in the room at the concept stage.

12–24 months